#16 Whole House Restorations in Gulfport

Before

After

Before

Before

Whole House Renovation

For this custom home remodel, Golden Construction Services completed the following:

Interior Renovations:

  • (3) large high impact slider doors
  • Custom cabinetry w/ flat slab doors
  • Granite counter tops
  • New appliances
  • Mosaic metal/ glass tile backsplash
  • Update laundry room
  • Update small guest bathroom
  • Convert Master Bath- Roman tub to large shower
  • Custom glass shower enclosure
  • 20" tile flooring
  • Remove ALL interior kitchen walls
  • Updated door casing- base boards- wood window sills
  • Master Bath plumbing fixtures:
    - 60" trench drain - 36"x 24" Rain head - dual purpose  
    - shower valves - hand head on slide bar
  • Remove interior Master Bath wall(s) & drop ceilings
    - Re route AC ductwork through Master Closet
  • Re texture all walls and ceilings   
  • Framing- drywall- painting
  • Install carpet in Bedrooms