#8 Floor Tile & Bathroom Renovation in Gulfport

After

Before

Bathroom Renovation with Extensive Tile Work

For this bathroom complete remodel, Golden Construction Services completed the following:

  • Enlarge shower area
  • Relocate shower valve
  • Vanity
  • Granite counter tops
  • Tile (Master Bath & throughout home)
  • Painting (All of interior)
  • Enlarge the bathroom door from a 24″ swinging door to a 36″ pocket door
  • Handy cap accessible
TOP